REFERENCES

EBP developed several potential Geothermal projects in Hungary, identified the potential sites and prepared the Pre-feasibility Studies, Business Plan and package it for a typical project at Álmosd, with possibility to repeat it at six other identified sites as an investment portfolio. Total renewable energy production capacity overtakes at least 10 MWe electricity and 30 MWth heat generation and cumulative CO2 emission saving is more than 130 ktons per annum.

Project development (including project financing) construction and operation of natural gas/oil fired steam boiler with 110 t/hr steam capacity.

Turn-key construction of a single unit extension to the plant consisting of a lignite fired steam boiler and turbine-generator set (157MW electric power capacity), Coal Handling System, Flue Gas Desulphurization Plant, Raw Water Supply System and Water Treatment Plant.

Project development (including project financing) construction and operation of a gas engine driven district heating power plant with 18 MW electrical and 17,1 MW heat capacity.

Development of EMA-POWER Ltd. Industrial Thermal Power Plant 200MW public and 87MW industrial CCGT expansion alternatives consisting of the preparation of feasibility studies, business plans, TSO capacity tender application document with draft PPA contract, development plans and project information memorandums.

Project development (including project financing) construction and operation of a gas turbine driven combined cycle industrial power plant (including steam boilers) with 35 MW electrical and 240 t/hr steam capacity.

Project development (including project financing) construction and operation of membrane (ultrafiltration and RO) based water treatment facility with 450 t/hr capacity.

Project development (including project financing) construction and operation of a gas turbine driven industrial power plant (including steam boilers) with 50 MW electrical and 240 t/hr steam capacity.

Project development (including project financing) construction and operation of a gas engine driven district heating power plant (including hot water boilers) with 6,4 MW electrical and 42,8 MW heat capacity.

Management of the pre-construction phase development of a 860 MW electrical power capacity dual fired Combined Cycle Gas Turbine (CCGT) Plant consisting of preparation of Detailed Feasibility Study, Environmental (PEA+IPPC), Grid Connection and Building Permits, EPC Contract and Long Term Maintenance Contract negotiations, Detailed Business Plan preparation, Commercial Contracts negotiations and Investment/Financing negotiations.

Management of the pre-construction phase development of a 860 MW electrical power capacity gas fired Combined Cycle Gas Turbine (CCGT) Plant consisting of preparation of Detailed Feasibility Study, Preliminary Environmental and Teritory Decision Permits, Detailed Business Plan preparation, Commercial Contracts negotiations and Investment/Financing negotiations.

Project development (including project financing) construction and operation of a gas engine driven district heating power plant (including hot water boilers) with 9,6 MW electrical and 58,2 MW heat capacity.

Management of the pre-construction phase development of EnviroParks corn to ethanol facility (3×150 mill. litres ethanol production capacity) with biomass- and waste-to-energy CHP plant (3x25MW electric power capacity) consisting of preparation of Detailed Feasibility Study, Environmental (PEA+IPPC) and Building Permits, Technology vendor and General Construction Contracts negotiations, Detailed Business Plan preparation, Commercial Contracts negotiations and Investment/Financing negotiations.

Turn-key construction of a twin unit extension to the plant consisting of 2×100 t/h steam capacity oil fired boilers, 60MW electrical capacity steam turbine extension, full-stream flue gas desulphurization unit and 110kV electrical substation enlargement.